The Hi 5 Basketball Academy is envisioned as more than a place to play basketball. With construction progressing across key facilities, the campus is steadily taking shape as a center of excellence dedicated to developing world-class athletes, nurturing skilled coaches, and hosting high-level training camps and tournaments.
Main Arena Building Block

The Main Arena, the heart of the academy has completed its internal plastering on the ground floor. 32 of the 36 ground -floor structural columns have been completed.
Swimming Pool

The Swimming Pool’s main vertical walls have been cast, while construction continues on the Dining Hall and Kitchen, Residential Apartment Block and supporting infrastructure.
Boy’s and Girl’s Hostel

Residential facilities like the Boy’s hostel and the Girl’s Hostel are advancing as well in construction.
Water Storage System

Additional borewell drilling has also been undertaken to strengthen the campus’s water infrastructure.
Compound Wall

The rear perimeter compound wall is complete up to the residential apartment alignment.
Drainage Systems

Work on drainage, internal pipelines, and the sewage treatment plant excavation is under way.
These developments represent important steps towards creating an integrated environment for training, accommodation and athlete development.
With every milestone, the vision moves closer to reality — creating new possibilities for children whose basketball passion deserves the opportunity to flourish.
